Stormwater 360 filter cleaning Case Study Challenges & Achievements Clean out 5 Spel and Stormwater 360 modules in poor access areas. Units Used 2500 L Vac [...]
Raglan Power outage 29 – 31 May 2024
Streamline Environmental & Drainage Team2024-06-26T14:24:57+12:00RAGLAN POWER OUTAGE 29 - 31 MAY 2024 Case Study Challenges & Achievements The power outage for a whole town for 3 days. Wastewater pumping stations offline [...]
Waikato Wide Pump Station Cleaning
Streamline Environmental & Drainage Team2023-08-22T16:58:52+12:00WAIKATO WIDE PUMP STATION CLEANING Case Study Challenges & Achievements Demonstrate a cost effective and safe way of cleaning 89 Pump stations throughout the Wa [...]
South Waikato municipal reactive contract
Streamline Environmental & Drainage Team2023-08-21T06:49:03+12:00SOUTH WAIKATO MUNICIPAL REACTIVE CONTRACT Case Study Challenges & Achievements Provide a rapid response to SWDC emergencies giving suitable vehicles at short not [...]
Grantham St Changeover
Streamline Environmental & Drainage Team2022-09-05T13:46:16+12:00GRANTHAM ST CHANGEOVER Case Study Challenges & Achievements Sucking out the flow in a critical situation during major works on a key pumping station through the [...]