Project Description

SOUTH WAIKATO MUNICIPAL REACTIVE CONTRACT

Case Study

Challenges & Achievements

Provide a rapid response to SWDC emergencies giving suitable vehicles at short notice.
Streamline was always able to respond within the hour and get issues sorted efficiently.

Vac02 at Tirau

Units Used

Overview

As a partner with Camex, we were able to supply multiple vehicles at short notice to the South Waikato district council for unblocking, spill clean ups and pump station flow control.

The Project

As a partner with Camex, we were able to supply multiple vehicles at short notice to the south
waikato district council for unblocking, spill clean ups and pump station flow control.
The Project
The south Waikato district includes Tirau, Putaruru and Tokoroa as its key towns where the bulk of
its wastewater infrastructure runs. A lot of the infrastructure was built between 1950 and 1980
when the local timber market was in its heyday. As time has gone on and these towns have had
stagnant or negative levels of population growth. Fortunately we know the networks in these towns
well, and are able to supply the most cost effective unit for the job. We always met the response
times set by our supplier Camex and completed the job to the specifications asked for. The key staff
at Camex and South Waikato District Council had positive feedback on the level of service and
response times we were able to provide.

The Outcome

  • The result was a high level of service

  • 24/7 On call avalable

  • The client was very impressed,

  • As a result Streamline has been given ongoing work in this area

Fat in sewer line

FREE QUOTE

Do you need help with waste water maintenance? Fill out this form to get in touch.

      PHONE

      0800 001 150

      WORKING HOURS

      24 / 7

      PHONE

      0800 001 150

      WORKING HOURS

      24 / 7